Projects

Explore our comprehensive portfolio showcasing our footprint across the agriculture, industrial, transportation, energy and infrastructure sectors. Each project reflects our steadfast dedication to engineering excellence, transparent contract management and timely execution. By adhering to the highest international standards, we transform complex visions into sustainable, enduring assets that build the future.

Shymkent / Kazakhstan

Construction of Greenhouse Complex in Kazakhstan including design works, earthworks, greenhouse structures, greenhouse surrounding roads, administrative and service buildings, infrastructure and landscaping works, gas and energy supply works. Project Area – 1,695,555 m² Closed Area – 1,216,000 m² (Steel Structure) Main / Auxiliary Buildings: 2,020 m² Earthworks – 4,800,000 m3 Road Works – 2 Lanes – 39,068 m² (5,046 m) Asphalt Road

Eskişehir / Türkiye

Construction of Greenhouse Complex in Eskişehir including design works, earthworks, greenhouse structures, greenhouse surrounding roads, administrative and service buildings, infrastructure and landscaping works, gas and energy supply works. The Eskişehir Mahmudiye Modern Greenhouse Project is planned to be Europe’s largest modern soilless greenhouse operating under a single roof in terms of production area. Project Area – 950,820 m² Closed Area – 812,608 m² (Steel Structure)

Istanbul / Türkiye

The Project consists of the engineering, procurement, construction, assembly and system integration, testing & commissioning works of 22.5 km long mass transit rail system between Kabataş-Mecidiyeköy-Mahmutbey with 6.5 km TBM/NATM tunnel construction work and viaducts, whole construction works of 3 stations, Architectural and electromechanical works of 15 stations, 1.5 km depot yard connection line and superstructure of the depot area and maintenance buildings.

Bucharest / Romania

The turn-key project consists of engineering, procurement, construction of 6,3 km double tube TBM tunnel, 6 stations, 1 integration station and 8 ventilation shafts. The project completion phase has 9 months of design, 39 months of execution and 60 months of defect liability period.
This project is the first phase of a metro line that will connect Bucharest city center with Henri Coanda International Airport. With the completion of the project, 50 thousand passengers will be transported in one direction and the existing metro network will be connected to the International Airport.