Client
Istanbul Metropolitan Municipality
Sector
Location
Istanbul / Türkiye
YENIKAPI-SISHANE SECTION METRO LINE PROJECT
The turn-key project consists of the engineering, procurement and construction of 3,7 km long metro system between Sishane and Yenikapi with 3 stations. The supply of 92 vehicles and full integration into an existing metro system is also included in the scope of the project.
Scope of Work:
• Design and Engineering Works
• Architectural Works
• Utility Works
• Power Supply and Traction Power
• Track Works
• Control and Communication System
• Environmental Control System
• Signalization System
• Escalators and Elevators
• Metro Vehicles
• Aksaray-Yenikapi LRT Connection
• Interface Management