Design and Build of Civil Works for Lot 1.1: 1 Mai – Tokyo Bucharest International Airport Rail Access Link (Metro Line 6. 1 Mai – Otopeni)
The turn-key project consists of engineering, procurement, construction of 6,3 km double tube TBM tunnel, 6 stations, 1 integration station and 8 ventilation shafts. The project completion phase has 9 months of design, 39 months of execution and 60 months of defect liability period.
This project is the first phase of a metro line that will connect Bucharest city center with Henri Coanda International Airport. With the completion of the project, 50 thousand passengers will be transported in one direction and the existing metro network will be connected to the International Airport.
Scope of Work:
• Design and Engineering Works
• Geological and Geotechnical Works
• Utility Works
• Civil Works of Metro Stations
• TBM Tunnel Works
• Interface Management