KABATAŞ-MECİDİYEKÖY-MAHMUTBEY METRO LINE PROJECT

The Project consists of the engineering, procurement, construction, assembly and system integration, testing & commissioning works of 22.5 km long mass transit rail system between Kabataş-Mecidiyeköy-Mahmutbey with 6.5 km TBM/NATM tunnel construction work and viaducts, whole construction works of 3 stations, Architectural and electromechanical works of 15 stations, 1.5 km depot yard connection line and superstructure of the depot area and maintenance buildings.

Scope of Work:

• Design and Engineering Works
• Geological and Geotechnical Works
• Utility Works
• Civil Works of Stations (3 Stations)
• Architectural and Electro-mechanical Works of Stations (18 Stations) and Line
• TBM Tunnel Works
• NATM Tunnel Works
• Depot Area Works
• Track Works
• Signaling and System Integration Works
• Interface Management

Customer
Istanbul Metropolitan Municipality
Completion Date
1st Phase Completed-2019 // 2nd Phase Completed-2023 // 3rd Phase Under Construction
Capacity
22,5km-18 Stations