Client
TCDD (General Directorate of Turkish State Railways)
Sector
Location
Ankara / Türkiye
HIGH SPEED RAILWAY CONSTRUCTION PROJECT ANKARA-ESKISEHIR RAILWAY LINE
The turn-key project consists of the engineering, procurement and installation of the railway line between Istanbul and Ankara, total 206 km, in order to achieve the train speed up to 200 km/h.
The work includes design and construction of the electrification, signalization and telecommunication systems, infrastructure and superstructure of Esenköy – Inonu Section and the disassembly of the existing line. The curb radiuses will be enlarged and new viaducts, tunnels and level crossings will be constructed.
Scope of Work:
• Design and Engineering Works
• Geological and Geotechnical Works
• Earthworks
• Utility Works
• NATM and Cut & Cover Tunnel Works
• Bridge and Viaduct Works
• Drainage and Culvert Works
• Track Works
• Electrification Works
• Signalization and Telecommunication systems
• Interface Management