Client
Istanbul Metropolitan Municipality
Sector
Location
İstanbul / Türkiye
4. LEVENT – AYAZAGA AND LEVENT-HİSARÜSTÜ METRO LINE PROJECT
The project consists of detailed design and construction of the M2 main line section from 4.Levent Station trail line until the end of Hacıosman Station, Sanayi, İTÜ Ayazağa, Atatürk Oto Sanayi, Darüşşafaka, Hacıosman stations, Seyrantepe Depot Area connection Lines and Seyrantepe Depot Area, Workshop and Station Building and Super structure Works as well as provision, assembly and commissioning works of the electro-mechanical systems.
Scope of Work:
• Design and Engineering Works
• Geological and Geotechnical Works
• Utility Works
• Civil Works of Stations
• Architectural and Electro-mechanical Works of Stations and Line
• NATM Tunnel Works
• Depot Area Works
• Trackworks
• Signaling and System Integration Works
• Interface Management