Client
Astana City Government (AKIMAT)
Sector
Location
Astana / Kazakhstan
ASTANA WATER DISTRIBUTION AND SEWERAGE PROJECT
The project consists of detailed engineering, procurement and implementation of all civil, mechanical, electrical and instrumentation works on a turn-key basis. Design and construction of a water treatment system (capacity 100,000 m³/day), a water intake structure in a pond with 23 m diameter (capacity 210,000 m³/day), water network distribution line (150 km) and rehabilitation of 17 sewage intermediate pump stations.
Scope of Work:
• Design and Engineering Works
• Geological and Geotechnical Works
• Procurement Services
• Construction Works
• Mechanical Works
• Electrical Works
• Commissioning Works