Home Projects
Client

ALTEK A.S.

Sector
Location

Kırklareli / Türkiye

KIRKLARELI NATURAL GAS COMBINED CYCLE POWER PLANT (2nd PHASE) PROJECT

The annual energy production of the plant with an installed capacity of 81.99 MW is 594.000.000 kWh. The plant is Combined Cycle Power Plant and consists of two (2) P&W FT.8 SWIFTPACK combustion turbines rated at 30 MW gross each and one (1) condensing steam turbine generator rated at 22 MW gross at annual mean ambient site conditions

Scope of Work:

• Design and Engineering Works
• Geological and Geotechnical Works
• Procurement Services
• Construction Works
• Mechanical Works
• Electrical Works
• Commissioning Works

Customer
ALTEK A.S.
Completion Date
2015
Capacity
81.99 MW -594 GWH